- Joined
- May 22, 2010
- Messages
- 228
- Trophies
- 0
- Age
- 38
- Location
- Can-uh-duh
- Website
- Visit site
- XP
- 409
- Country
No, it actually was confirmed to be delayed by Hykem.
People keep quoting that over and over and over and yet don't seem to realize that doesn't confirm any delay. At all. It CAN mean that, given that "vacations" in in quotations, but, do you know what else it could mean? That he just has more time to work on it. Until he himself says it'll be delayed, or through some one else like SonyUSA or Zecoxao (for example), then he's on schedule. Also all the people saying he's posted release dates and promises, neither of those have happened. He's given release ESTIMATES, and never once promised it would be within that time frame. Simply estimates based on his current progress and/or rate of work. In regards to the Christmas "release" he just had simply hoped to have it coincide with the date, it doesn't mean it was some confirmed date.
The only evidence we have to the contrary is flimsy at best. The first of which is the current date, only a few days left of January, but we don't know how far along he is with obfuscation and anything else he (and others) are intending on releasing alongside the IOSU exploit. The second is the update that Zecoxao gave us saying that work on porting to several firmwares was still underway. Both of those say nothing about a delay, they may cause one, they may not.
EDIT: Quote fail.
Last edited by Deathwing Zero,